A Total of 27 submissions have been received in the stage 1 competition and the distribution of the different bridge types submitted is as follows:
Bridge
Type Number
Cable-stayed 22
Suspension 2
Hybrid of cable-stayed and suspension 3
After evaluation by the Technical Evaluation Committee and the Aesthetic Committee, 5 proposals have been selected to enter stage 2 of the Design Competition.
Winner First Runner-up Second Runner-up Honourable Mention Honourable Mention
A Design Team comprising Scott Wilson - Leonhardt Andrä J.V. Team comprising T.Y. Lin International in association with HNTB Team comprising ConsultingKORTES Ltd in association with Finnroad Ltd
  • Halcrow Group Limited
  • Flint & Neill Partnership
  • Dissing+Weitling
  • Shanghai Municipal Engineering Design Institute
  • Scott Wilson (Hong Kong) Ltd
  • Leonhardt Andrä und Partners
  • Planungsgruppe Professor Laage
  • Eagle Lyon Pope Associates Port & Marine Consultants
  • Scott Wilson Pavement Engineering Ltd.
  • Lightsource International (Asia) Ltd.
  • Moonlighting
  • Gensler Architecture Design & Planning Worldwide
  • H. M. Brandston & Partners
  • HNTB Corporation
  • Humen Engineering Consultants Ltd
  • Design Institute of Highway Survey & Planning of Guangdong
  • Earth-Tech, Inc
  • Guy Nordenson and Associates
  • Wolf Architecture