2.2 The Design and Construction Consultancy Assignment “Agreement No. CE72/98 Route 8 between Tsing Yi and Cheung Sha Wan” was awarded to Ove Arup and Partners Hong Kong Ltd (Arup).
2.3
The construction of the Phase
2.1
Phase
2.2
The Phase
2.3
The Phase
Table
2.
|
Area |
Details of
Site Activities |
|
P |
Segment delivery, erect and fixing; pier, bridge deck
and parapet construction; and booster bump house construction |
|
P |
Deck and parapet
construction, drainage
laying and fixing, masking wall and
in-situ slab construction |
|
P |
Tendon
fixing, installation of external tendon duct and parapet / barrier construction
|
|
P |
Segment storage and
delivery and preparation works for gantry |
|
P |
Tendon
fixing, installation of anchor block for external tendon. |
|
P |
Deck
parapet skin erection |
Table 2.2 Major Site Activities undertaken during the reporting period (Restricted Hours)
|
Area |
Details of
Site Activities |
|
P |
Pier construction, bridge
deck construction, segment delivery, erect and fixing, parapet concreting, tendon stressing and
wire strand threading . (evening, night
and public
holidays). |
|
P |
Bridge deck construction
and deck parapet skin erection. (evening, night and public holidays) |
|
P |
Segment storage and
delivery and preparation works for parts of gantry. (evening, night and
public holidays) |