7
AUDIT RESULTS
7.1.1
For
7.1.2
For 24-hour TSP monitoring, a total of
7.2.1
A total of
7.2.2
A total of
7.2.3
A total of
7.2.4
A total of 9 sets of 6 x Leq(5min) measurements were
taken in public holidays (i.e. 0700 to
7.3.1
A total of 3 Effluent Discharge Licenses were
granted by EPD. In accordance with the
conditions of the licenses, water sampling at designated discharge points shall
be carried out on a monthly basis for area P
7.3.2
One water
samples was taken on
7.3.3
One water sample was taken on
7.4.1
Waste generated from the Phase
7.4.2
With effect from
7.4.3
On
7.4.4
Based on the information provided by CHEC with
respect to relevant handling records and trip tickets of the Phase
Table
7.
|
Material
Type |
Quantity
Produced in the reporting period |
Handling
Method |
Handling
Quantities in the reporting month |
Temporary Storage Locations On-site (if
applicable) |
|
|
C&D
materials |
(Public Fill) |
|
Deliver to Public Fill Area
(Tuen Mun Area 38) |
6,420 m3 |
N/A |
|
(C&D Waste) |
N/A |
To be recycled (paper) |
N/A |
P |
|
|
N/A |
To be recycled (aluminum
can) |
N/A |
P |
||
|
N/A |
To be recycled (plastic
bottle) |
N/A |
P |
||
|
N/A |
To be reused |
N/A |
P |
||
|
N/A |
To be returned to supplier |
N/A |
P |
||
|
57. 8. |
Collected by licensed
collector for disposal to SENT and WENT landfills |
65.38 tones |
N/A |
||
|
Chemical waste |
N/A |
Collected by licensed
chemical waste collector |
N/A |
N/A |
|
7.5.1
Scheduled site audits were carried out by the ET
and IEC on a regular basis in accordance with the EM&A Manual. Sections below provide a detail summary of
the findings identified during these audits and their corresponding implemented
corrective and preventive measures.
Photographs of implemented measures are presented in Appendix Q.
Environmental Team Site Audit
7.5.2
Weekly site audits were conducted by the ET
during the reporting period and the major findings are summarized as follows.
i.
Rubbish
/ debris / sediment were accumulated in the u-channels and catchpit
at P
Corrective
and Preventive Actions The u-channels and catchpit
had been cleared immediately after the site inspection. In addition, all temporary drainage and
runoff control systems had been maintained properly on a weekly basis. For Pier
SB38 and SB39, the slope formation had been completed and hydroseeding was
carried out by CHEC by end of January 2006. Sandbags have been deployed in the
u-channel as an interim measure. Completed and
ii.
Oil
stain on the ground at area P
Corrective and Preventive Actions The oil stain and
contaminated soil had been cleared as chemical waste and was temporarily stored
in the Chemical Waste Storage Area on site.
(Please refer to Appendix Q, Photo 6). Completed and
iii.
Insufficient
wheel facilities were provided at roundabout CP3/CP4 and mud track were
observed on the public road.
Corrective and Preventive Actions Ramps and high
pressure water jets have been provided at the site exits. Waste water generated
from wheel washing water would be diverted back to the site area for soakaway. In
addition, all the existing gullies within the roundabout had been blocked. (Please
refer to Appendix Q, Photo 7 to 9). Completed
and
iv.
For
area P
Corrective and
Preventive Actions Proper
enclosure (sheltered on top and the 3 sides) has been provided for the
debagging and cement mixing process. Completed and
Independent Environmental Checker (IEC) Site Audit
7.5.3
The monthly IEC audit was carried out on
i.
Insufficient wheel washing facilities were
provided at roundabout CP3/CP4 and mud trails were observed on the public road. CHEC was urged to provide proper wheel
washing and treatment facilities with petrol interceptor without further delay.
Corrective
and Preventive Actions Ramps and
high pressure water jets have been provided at the site exits. Waste water
generated from wheel washing water would be diverted back to the site area for soakaway. In
addition, all the existing gullies within the roundabout had been blocked. (Please refer to Appendix
Q, Photo 7 to 9.
ii.
Inadequate enclosure was provided for the
concrete debagging and mixing facility at P
Corrective
and Preventive Actions Proper
enclosure has been provided for the debagging and cement mixing process. (Please refer to Appendix
Q, Photo
iii.
No treatment facilities were provided for the
u-channel adjacent to Pier SB 38 & 39 near P
Corrective
and Preventive Actions Slope formation had been completed and
hydroseeding was carried out by CHEC by end of January 2006. Sandbags have been
deployed in the u-channel. (Please refer to Appendix
Q Photo 4 to 5). The
situation will be monitored by ET continuously.
Environmental
Protection Department (EPD)
Site Inspection
7.5.4
No EPD site inspections were carried out during
the reporting period.