An Environmental Permit (EP-085/2000/C) was granted to
Highways Department by the Environmental Protection Department for the
construction of Route 8 between Tsing Yi and Cheung Sha Wan Project.
This EP covers four phases of the Route 8 Project namely Phase
This is the 47th monthly Environmental
Monitoring and Audit (EM&A) report for the “Phase
The structure of the report is as follows:
|
Section |
INTRODUCTION
– details the scope and structure of the report. |
|
Section 2: |
PROJECT
INFORMATION – summarizes the background and scope of the
project, project organization, construction programme
and the construction works undertaken during the reporting period. |
|
Section 3: |
ENVIRONMENTAL
MONITORING REQUIREMENTS – summarizes the monitoring programmes, Action and Limit Levels, Event Action Plans,
environmental mitigation measures as recommended in the EIA Report and
relevant environmental requirements. |
|
Section 4: |
IMPLEMENTATION
STATUS ON ENVIRONMENTAL PROTECTION REQUIREMENTS – summarizes
the implementation of environmental protection measures during the reporting
period. |
|
Section 5: |
ENVIRONMENTAL
LICENCE AND PERMITTING REQUIREMENTS – summarizes the
environmental licences and permits obtained or
being applied during the reporting period. |
|
Section 6: |
MONITORING
RESULTS – reports the monitoring results obtained in the
reporting period. |
|
Section 7: |
AUDIT RESULTS
– summarizes the audit findings in the reporting period. |
|
Section 8: |
COMPLAINTS,
NOTIFICATIONS OF SUMMONS AND PROSECUTIONS DURING THE REPORTING PERIOD
– summarizes the complaints, notifications of summons and prosecutions
recorded during the reporting period. |
|
Section 9: |
FUTURE KEY
ISSUES – summarizes the future key issues as reviewed from the
works programme and work method statements. |
|
Section |