2.1.1 The Design and Construction Consultancy Assignment “Agreement No. CE72/98 Route 8 between Tsing Yi and Cheung Sha Wan” was awarded to Ove Arup and Partners Hong Kong Ltd (Arup).
2.1.2
The construction of the Phase
2.2.1
Phase
2.3.1
The Phase
2.4.1
The Phase
Table
2.
|
Area |
Details of
Site Activities |
|
P |
Segment delivery and its associated erection and
fixing; pier, bridge deck and parapet
construction; grouting
of tendon ducting and drainage system installation. |
|
P |
Deck and parapet
construction; drainage
laying and fixing; masking wall and drainage system installation. |
|
P |
Deck
parapet / barrier construction and installation |
|
P |
Segment storage and
delivery and preparation works for gantry |
Table 2.2 Major Site Activities undertaken during the reporting period (Restricted Hours)
|
Area |
Details of
Site Activities |
|
P |
Pier construction; bridge
deck construction; segment delivery and its associated erection and fixing; parapet concreting;
in-situ stitching construction; steel mould erection and installation. (Evening, night and public holidays). |
|
P |
Bridge deck construction,
median barrier construction and deck parapet skin erection. (Evening, night
and public
holidays) |
|
P |
Bridge deck construction,
erection of formwork and parapet installation. (Evening, night and public holidays) |
|
P |
Segment storage and
delivery and preparation works for gantry. (Evening, night and public holidays) |