An Environmental Permit (EP-085/2000/C) was granted to
Highways Department by the Environmental Protection Department for the
construction of Route 8 between Tsing Yi and Cheung Sha Wan Project. This EP covers four phases of the Route 8
Project namely Phase
This is the 49th monthly Environmental Monitoring
and Audit (EM&A) report for the “Phase
The structure of the report is as follows:
|
Section |
INTRODUCTION – details the scope and structure of the report. |
|
Section 2: |
PROJECT INFORMATION – summarizes the background and scope of
the project, project organization, construction programme and the
construction works undertaken during the reporting period. |
|
Section 3: |
ENVIRONMENTAL MONITORING REQUIREMENTS – summarizes the
monitoring programmes, Action and Limit Levels, Event Action Plans,
environmental mitigation measures as recommended in the EIA Report and
relevant environmental requirements. |
|
Section 4: |
IMPLEMENTATION STATUS ON ENVIRONMENTAL PROTECTION REQUIREMENTS
– summarizes the implementation of environmental protection measures during
the reporting period. |
|
Section 5: |
ENVIRONMENTAL LICENCE AND PERMITTING REQUIREMENTS –
summarizes the environmental licences and permits obtained or being applied
during the reporting period. |
|
Section 6: |
MONITORING RESULTS – reports the monitoring results obtained
in the reporting period. |
|
Section 7: |
AUDIT RESULTS – summarizes the audit findings in the
reporting period. |
|
Section 8: |
COMPLAINTS, NOTIFICATIONS OF SUMMONS AND PROSECUTIONS DURING THE
REPORTING PERIOD – summarizes the complaints, notifications of
summons and prosecutions recorded during the reporting period. |
|
Section 9: |
FUTURE KEY ISSUES – summarizes the future key issues as reviewed
from the works programme and work method statements. |
|
Section |