2.1.1
The Design and Construction Consultancy Assignment
“Agreement No. CE72/98 Route 8 between Tsing Yi and
Cheung Sha Wan” was awarded to Ove
Arup and Partners Hong Kong Ltd (Arup).
2.1.2
The construction of the Phase
2.2.1
Phase
2.3.1
The Phase
2.4.1
The Phase
Table
2.
|
Area |
Details of
Site Activities |
|
P |
Segment delivery and its associated erection and
fixing; pier, booster pump house, bridge deck and parapet construction; grouting of tendon ducting and drainage system
installation. |
|
P |
Deck and parapet
construction; drainage
laying and fixing; masking wall and drainage system installation. |
|
P |
Deck
parapet / barrier construction and installation |
|
P |
Segment storage and
preparation works for gantry. |
Table 2.2
Major Site Activities undertaken during the reporting period (Restricted
Hours)
|
Area |
Details of
Site Activities |
|
P |
Pier construction; bridge
deck construction; segment delivery and its associated erection and fixing; parapet concreting;
in-situ stitching construction; steel mould erection and installation. (Evening, night and public holidays). |
|
P |
Bridge deck construction,
median barrier construction and deck parapet erection. (Evening and public holidays) |
|
P |
Deck parapet erection.
(Evening and public
holidays) |
|
P |
Segment storage and
delivery and preparation works for gantry. (Evening and public holidays) |