Appendix I: Implementation Status of Environmental Protection Requirement

 

Environmental Protection Measures

Timing

Implementation Stages*

Activities

 

29/06/06 to 28/07/06

29/07/06 to 28/08/06

29/08/06 to 28/09/06

29/09/06 to 28/10/06

Landscape and visual

Erection, painting and maintenance of site hoardings around works and storage areas.

Throughout the construction period

P

P

P

P

Restrictions on the height of material/spoil stockpiles.

P

P

P

P

Prompt hydro-seeding of disturbed areas and cut/fill slopes prior to the permanent landscaping works.

P

P

P

P

Avoidance of chunam or shotcreting slope treatments.

P

P

P

P

Conservation of topsoil where practical.

P

P

P

P

Site litter patrols and regular site waste collection.

P

P

P

Maintenance of planting.

P

P

P

P

Ecological Impact

Minimise damage outside works areas

P

P

P

P

Construction:

 

Material Storage

Covers for dusty stockpiles

Throughout the construction period

Vehicle movement

Haul road watering, vehicle wheel wash prior to exit. Where practical, access roads should be protected with crushed gravel.

P

P

P

Plant maintenance

All plant shall be maintained to prevent any undue air emissions.

P

P

P

P

All plant activity

Reference should be made the EM&A Manual Action Plan for measures for consideration when Noise Limit Levels are not met.

P

P

P

P

Plant maintenance

All plant shall be maintained to prevent any undue noise nuisance.

P

P

P

P

Wheel wash

All wheel wash water shall be diverted to a sediment pit.

Throughout the construction period

 

P

Concrete Truck Washout

All concrete trucks shall wash out into a lined pit.

P

 

P

 

P

 

P

 

Surface water diversion

All clean surface water shall be diverted around the site.

P

P

P

P

Sediment control

Sediment removal facilities shall be provided and be maintained and excavated as necessary to prevent sedimentation of the channel. Perimeter channels shall be provided. Works shall be programmed for the dry season where feasible.

P

(Not all, in progress)

P

(Not all, in progress)

P

(Not all, in progress)

P

(Not all, in progress)

Fuel can storage

All fuel cans shall be placed within a bundled area.  Any fuel spills shall be mopped up as necessary.

P

P

P

P

Slope covers

Finished slopes and other slopes near drainage areas shall be covered prior to rains to reduce sedimentation of runoff. Slopes should be hydroseeded or shotcreted as early as possible to prevent erosion.

P

P

P

P

Excavation works

Excavation works shall avoid sensitive areas.

Throughout the excavation work period

P

P

P

P

Material, plant movement & fuel can refilling.

Any fuel or oil spills shall be excavated and disposed off.

Throughout the construction period

 

P

P

P

P

Generators

All generators shall be placed within a bundled area.  Any fuel spills shall be mopped up as necessary.

P

P

P

P

Material containers

All empty bags and containers shall be collected for disposal.

 

P

P

P

P

Worker generated litter and Waste

Litter receptacles shall be placed around the site.  Litter shall be taken regularly to the refuse collection points. Chemical toilets (or suitable equivalent) should be provided for workers. Any canteens should have grease-traps.

Throughout the construction period

 

P

Neighbourhood nuisance

All complaints regarding construction works shall be relayed to the Environmental Team.

P

P

P

P

Legal requirements

Different types of waste should be segregated, stored, transported and disposed of in accordance with the relevant legislative requirements and guidelines

P

(in progress)

P

(in progress)

P

(in progress)

P

(in progress)

On-site separation

On-site separation of municipal solid waste and construction/demolition wastes should be conducted as far as possible in order to minimize the amount of solid waste to be disposed to landfill.

P

(in progress)

P

(in progress)

P

(in progress)

P

(in progress)

Temporary storage area

Separated wastes should be stored in different containers, skips, or stockpiles to enhance reuse or recycling of materials and encourage their proper disposal.

P

P

P

P

Record of wastes

Records of quantities of wastes generated, recycled and disposed (with locations) should be properly kept.

P

(in progress)

P

(in progress)

P

(in progress)

P

(in progress)

Trip-ticket system

To monitor the disposal of waste at landfills and control fly-tipping, a “trip-ticket” system for all solid waste transfer/disposal operations should be implemented. The system should be included as a contractual requirement, and monitored by the Environmental Team and audited by the Independent Environmental Checker.

P

(in progress)

P

(in progress)

P

(in progress)

P

(in progress)

 

*      N/A    = Not Applicable

P  = Implemented

      = Rectified