2.1.1 The Design and Construction Consultancy Assignment “Agreement No. CE72/98 Route 8 between Tsing Yi and Cheung Sha Wan” was awarded to Ove Arup and Partners Hong Kong Ltd (Arup).
2.1.2
The construction of the Phase 1 Contract was
awarded to China Harbour Engineering Company (Group) (CHEC) on
2.2.1 Phase 1 works area is located in urban area. The sensitive receivers are mainly residential buildings at Mei Foo Sun Chuen, Hoi Lai Estate (Site 10) and the dwellings at Stonecutters Military Base. The site location plan and the monitoring locations are presented in Appendix A and F respectively.
2.3.1 The Phase 1 Contract organization chart and contact details are shown in Appendix B.
2.4.1 The Phase 1 Contract’s Three Months Rolling Programme is presented in Appendix C. The major site activities undertaken during normal hours and restricted hours in the reporting period are summarized in Table 2.1 and Table 2.2 respectively.
Table 2.1 Major Site Activities undertaken during the reporting period (Normal Hours)
|
Area |
Details of
Site Activities |
|
P1-SA1 |
Segment delivery and its associated erection and
fixing; booster pump house, bridge deck and parapet
construction; grouting
of tendon ducting and drainage system installation. |
|
P1-SA6 |
Deck and parapet
construction; drainage
laying and fixing; masking wall and drainage system installation. |
|
P1-SA8 |
Deck
parapet / barrier construction and installation |
|
P1-SA9 |
Segment storage and
preparation works for gantry. |
Table 2.2 Major Site Activities undertaken during the reporting period (Restricted Hours)
|
Area |
Details of
Site Activities |
|
P1-SA1 |
Bridge deck construction; segment
delivery and its associated erection and fixing; parapet concreting; in-situ stitching
construction; steel mould erection and installation. (Evening, night and public holidays). |
|
P1-SA6 |
Viaduct finishing and
surfacing; site clearance. (Public holidays) |