2.1.1 The Design and Construction Consultancy Assignment “Agreement No. CE72/98 Route 8 between Tsing Yi and Cheung Sha Wan” was awarded to Ove Arup and Partners Hong Kong Ltd (Arup).
2.1.2
The construction of the Phase
2.2.1
Phase
2.3.1 The Phase 1 Contract organization chart and contact details are shown in Appendix B.
2.4.1
The Phase 1 Contract’s Three
Months Rolling Programme is presented in Appendix C. The major site activities undertaken during
normal hours and restricted hours in the reporting period are summarized in Table
2.
Table 2.
|
Area |
Details
of Site Activities |
|
P |
Segment delivery and
its associated erection and fixing; booster pump house, bridge deck and parapet construction; grouting of tendon
ducting and drainage system installation. |
|
P |
Deck and parapet
construction; drainage laying and fixing; masking wall; drainage system; noise barrier and sign gantry
installation and E&M works. |
Table 2.2 Major Site Activities undertaken during the reporting period (Restricted Hours)
|
Area |
Details
of Site Activities |
|
P1-SA1 |
Parapet construction; grouting of tendon ducting, and steel mould erection and
installation (Public holidays). |
|
P1-SA6 |
Parapet construction; general site clearance on bridge deck (Public holidays). |