7 AUDIT RESULTS
7.1.1
For
7.1.2
For 24-hour TSP monitoring, a total
of 15 sets of measurement were carried out at ASR
7.2.1
A total of 9 sets of Leq(30min)
measurement were taken in the daytime (i.e. 0700 to
7.2.2
Since
no construction works were undertaken during evening and night-time, therefore
no noise monitoring was carried out for these periods during the reporting
month.
7.2.3
A total of 5 set of 6 x Leq(5min)
measurements were taken in public holidays (i.e. 0700 to 1900 hours during
holidays) at the closest monitoring stations (NSR1, NSR2 and NSR3) and no
exceedances were recorded.
7.3.1
A total of 3 Effluent Discharge
Licenses were granted by EPD. In
accordance with the conditions of the licenses, water sampling at designated
discharge points shall be carried out on a monthly basis for area P
7.3.2
A renewal application for the
Discharge License (No: EP482/269/0038/I) was submitted to EPD for approval on
7.3.3
Five water samples were taken
for the whole site by CHEC on
7.3.4
Two water samples were taken
for P1-SA1 (Part 1, Grid
7.4 Waste Management
7.4.1
The Waste Management Plan (WMP)
was approved by EPD on
7.4.2 A revised WMP (Rev. 17) was submitted to EPD for information on 11th May 2006 with the latest information including the most up to date estimation of inert C&D materials and non-inert C&D materials.
7.4.3
With effect from
7.4.4
On
7.4.5
Based on the information
provided by CHEC with respect to relevant handling records and trip tickets of
the Phase
Table 7.
|
Material
Type |
Quantity
Produced in the reporting period |
Handling
Method |
Handling
Quantities in the reporting month |
Temporary Storage Locations On-site (if
applicable) |
|
|
C&D materials |
(Public Fill) |
447 no. of Trucks |
Tuen Mun Fill
Bank (Tuen Mun Area 38) |
Approx. 2,012m3 |
N/A |
|
(C&D Waste) |
N/A |
To be recycled
(paper) |
N/A |
P |
|
|
N/A |
To be recycled
(aluminum can) |
N/A |
P |
||
|
N/A |
To be recycled
(plastic bottle) |
N/A |
P |
||
|
N/A |
To be reused |
N/A |
P |
||
|
N/A |
To be returned
to supplier |
N/A |
P |
||
|
C&D materials |
(C&D Waste) |
63.5 tones (SENT) |
Collected by
licensed collector for disposal to SENT and WENT landfills |
63.5 tones |
N/A |
|
Chemical waste |
N/A |
Collected by
licensed chemical waste collector |
N/A |
P |
|
7.5.1 Scheduled site audits were carried out by the ET and IEC on a regular basis in accordance with the EM&A Manual. Sections below provide a detailed summary of the findings identified during these audits and their corresponding implemented corrective and preventive measures. Photographs of implemented measures are presented in Appendix Q.
7.5.2 Weekly site inspections were conducted by the ET during the reporting period and the major findings are summarized as follows:
i. No drip trays were provided for larvicidal oil at area P1-SA1 (Part 1, next to vehicular entrance).
Corrective and Preventive Actions – The larvicidal oil has been removed. Completed and closed. (Please refer Appendix Q, Photo 01).
ii.
Stagnant water was accumulated
at the segment storage yard in area P1-SA1 (Part 1).
Corrective and Preventive Actions – Stagnant water together with deposited silt had been cleared to
minimize the risk of mosquito breeding.
Completed and
iii.
Oil stain on the ground was
found behind the Kinko’s site office at area P1-SA1 (Part 2).
Corrective and Preventive Actions – All contaminated materials had been cleared as chemical waste and
temporarily stored at the chemical waste storage area. Completed and closed. (Please refer Appendix
Q, Photo 03).
iv.
Debris was scattered around the
Kinko site office at area P1-SA1.
Corrective and Preventive Actions – All debris and rubbish have been removed. Completed and closed. (Please refer Appendix Q, Photo 04).
v.
Open stockpiles of dusty
materials were observed at area P1-SA1 (Part 2, near Pier F12).
Corrective and Preventive Actions – All open stockpiles have been removed. Completed and closed. (Please refer Appendix
Q, Photo 05).
Independent Environmental Checker (IEC) Site Audit
7.5.3
The monthly IEC audit was
carried out on
Observation(s)
i.
Stagnant water was accumulated
at the segment storage yard in area P1-SA1 (Part 1).
Corrective and Preventive Actions - Stagnant water together with deposited silt had been cleared to
minimize the risk of mosquito breeding.
Completed and closed. (Please
refer Appendix Q, Photo 02).
ii.
Oil stain on the ground was
found behind the Kinko’s site office at area P1-SA1 (Part 2).
Corrective and Preventive Actions - All contaminated materials had been cleared as chemical waste and
temporarily stored at the chemical waste storage area. Completed and closed. (Please
refer Appendix Q, Photo 03).
iii.
Debris was scattered around the
Kinko site office at area P1-SA1.
Corrective and Preventive Actions - All debris and rubbish have been removed. Completed and closed. (Please refer Appendix
Q, Photo 04).
Environmental Protection Department (EPD) Site Inspections
7.5.1 No joint site inspections were carried out with EPD during the reporting period.