2.1.1 The Design and Construction Consultancy Assignment “Agreement No. CE72/98 Route 8 between Tsing Yi and Cheung Sha Wan” was awarded to Ove Arup and Partners Hong Kong Ltd (Arup).
2.1.2
The construction of the Phase
2.2.1
Phase
2.3.1
The Phase
2.4.1
The Phase
Table 2.
|
Area |
Details
of Site Activities |
|
P |
Booster pump
house and parapet construction;
grouting
of tendon ducting; drainage system installation; TCSS & E&M works;
and |
|
P |
Parapet
construction; drainage laying and fixing; drainage system; noise barrier and sign gantry installation and
E&M works. |
Table 2.2 Major Site Activities undertaken during the reporting period (Restricted Hours)
|
Area |
Details
of Site Activities |
|
P1-SA1 |
Parapet construction; external tendon stressing, and steel mould erection and
installation (Public holidays). |
|
P1-SA6 |
Steel mould erection and dismantling for median barriers construction (Public holidays). |