7.1.1
For
7.1.2
For 24-hour TSP monitoring, a total of 18 sets of measurement were carried out
at ASR
7.2.1
A total of 12 sets of Leq(30min) measurement
were taken in the daytime (i.e. 0700 to
7.2.2
Since no
construction works were undertaken during evening and night-time, therefore no
noise monitoring was carried out for these periods during the reporting month.
7.2.3
A total of 4 set of 6 x Leq(5min)
measurements were taken in public holidays (i.e. 0700 to
7.3.1
A total of 3 Effluent Discharge Licenses were
granted by EPD. In accordance with the
conditions of the licenses, water sampling at designated discharge points shall
be carried out on a monthly basis for area P
7.3.2
Four water samples were taken for the whole site
by CHEC on
7.3.3
Two water samples were taken for P1-SA1 (Part 1,
Grid
7.4.1
The Waste Management Plan (WMP) was approved by EPD on
7.4.2
A revised WMP (Rev. 20) was submitted to EPD for
information on 26th June 2007 with the latest information including
the most up to date estimation of inert C&D materials and non-inert C&D
materials.
7.4.3
With effect from
7.4.4
On
7.4.5
Based on the information provided by CHEC with
respect to relevant handling records and trip tickets of the Phase
Table
7.
|
Material
Type |
Quantity
Produced in the reporting period |
Handling
Method |
Handling
Quantities in the reporting month |
Temporary Storage Locations On-site (if
applicable) |
|
|
C&D
materials |
(Public
Fill) |
505 no. of Trucks |
Tuen Mun Fill Bank (Tuen
Mun Area 38) |
Approx. 2,273m3 |
N/A |
|
(C&D Waste) |
N/A |
To be recycled (paper) |
N/A |
P |
|
|
N/A |
To be recycled (aluminum
can) |
N/A |
P |
||
|
N/A |
To be recycled (plastic
bottle) |
N/A |
P |
||
|
N/A |
To be reused |
N/A |
P |
||
|
N/A |
To be returned to supplier |
N/A |
P |
||
|
C&D
materials |
(C&D Waste) |
189 tones (SENT) |
Collected by licensed
collector for disposal to SENT and WENT landfills |
189 tones |
N/A |
|
Chemical waste |
N/A |
Collected by licensed
chemical waste collector |
N/A |
P |
|
7.5.1
Scheduled site audits were carried out by the ET
and IEC on a regular basis in accordance with the EM&A Manual. Sections below provide a detailed summary of
the findings identified during these audits and their corresponding implemented
corrective and preventive measures.
Photographs of implemented measures are presented in Appendix Q.
7.5.2
Weekly site inspections were conducted by the ET
during the reporting period and the major findings are summarized as follows:
i.
No wheel washing facilities were provided at the
vehicular exit points at areas P1-SA6 (
Corrective and Preventive Actions – All concerned vehicular exit points
had been closed. Completed and
ii.
Mosquito larvae were found in stagnant water
within the pre-cast concrete gullies and structural steelwork at area P1-SA1.
Corrective and Preventive Actions – CHEC reported that stagnant
water had been removed as far as practical. The frequency of applying temephos/
larvicidal oil has been enhanced in order to reduce the risk of mosquito
breeding. Completed and
iii.
The de-sludge pipe of the Chemical Enhanced
Treatment Plant (CETP) at area P1-SA6 (STP) was incorrectly connected to
discharge point.
Corrective and Preventive Actions – The pipe has been disconnected
immediately at the time of site inspection. Completed and closed. (Please refer Appendix
Q, Photo 03).
iv.
The wheel washing basin was found full of
stagnant water at area P1-SA6 (STP). In
addition, CHEC was reminded to deploy suitable chemical / coagulant for the
CETP at P1-SA6
Corrective and Preventive Actions – The water pump for the wheel
washing basin had been repaired.
Wastewater has been diverted from the basin to the CETP in order to
avoid overflowing of substandard effluent into storm drain. In addition, proper
chemical / coagulant has been deployed for the CETP. Completed and
closed. (Please refer Appendix Q, Photo 04).
v.
For area P1-SA1 (Part 1), oil leakage was
observed next to Luen Hing workshop). In
addition, drip trays for the generators (storage yard) were found full of oily
water.
Corrective and Preventive Actions – All contaminated material and
oily water had been cleared as chemical waste. Completed and closed.
(Please refer Appendix Q,
Photo 05).
Independent Environmental Checker (IEC) Site Audit
7.5.3
The monthly IEC audit was carried out on
i.
No wheel washing facilities were provided at the
vehicular exit point at area P1-SA1 (Part 2, ramp F).
Corrective and Preventive Actions - The concerned vehicular exit point has been closed. Completed and closed.
ii.
The wheel washing basin was found full of
stagnant water at area P1-SA6 (STP). In addition, CHEC was reminded to deploy
suitable chemical / coagulant for the CETP at P1-SA6.
Corrective and Preventive Actions - Wastewater from the basin has
been diverted to the CETP in order to avoid overflowing of substandard effluent
into storm drain. In addition, proper chemical / coagulant has been deployed
for the CETP. Completed and closed. (Please refer Appendix
Q, Photo 04).
iii.
Oil leakage was observed at area P1-SA1 (Part 1,
next to Luen Hing workshop).
Corrective and Preventive Actions - All contaminated material had
been cleared as chemical waste. Completed and closed. (Please refer Appendix
Q, Photo 05).
iv.
Drip trays for the generators at area P1-SA1
(Part 1, storage yard) were found full of oily water.
Corrective and Preventive Actions - All oily water had been cleared
as chemical waste. Completed and closed.
Environmental Protection Department (EPD) Site
Inspections
7.5.4
A joint site inspection was carried out with EPD
on
i.
All generators located within the site area, in
particular the ones on the bridge deck should be sheltered from rain water in
order to prevent spilled oil/fuel from entering into storm drains.
Corrective and Preventive Actions – Shelter
would be arranged for those generators located at the area where petrol
interceptor was not incorporated in the drainage system. The situation will be monitored by RSS and ET
continuously.
ii.
Stagnant water was accumulated within the
structural steelwork and tanks at area P1-SA1; and sedimentation tank at area
P1-SA6 (STP).
Corrective and Preventive Actions – CHEC
reported that stagnant water had been removed as far as practical. The frequency of applying temephos/
larvicidal oil has been enhanced in order to reduce the risk of mosquito
breeding. Completed and
iii.
CHEC was advised to review the whole temporary
drainage system including the set up of the Chemical Enhanced Treatment Plant
(CETP) at area P1-SA6 (adjacent to DSD STP).
Corrective and Preventive Actions – Daily
inspection has been carried out by CHEC in order to ensure the drainage system
together with the CETP is functioning.
Completed and
iv.
CHEC was reminded that proper vehicle washing
facilities should be provided at every designated vehicle exit point.
Corrective and Preventive Actions – Wheel
washing facilities including high pressure water jet have been provided at all
designated vehicle exit points.
Completed and
v.
Appropriate sufficient dust control measures
such as water spraying should be deployed for earth work operation at area
P1-SA6 (next to Bus Depot).
Corrective and Preventive Actions – Watering
spraying by means of water bowser and hoses has been carried out during earth
work operation at the concerned area.
Completed and